busy highway aerial photo
busy highway aerial photo

Pacific Motorway (M1) Projects

Client/s: Seymour White

Location: Gold Coast, QLD

Services: CMT, Geotechnical, Environmental

Construction Sciences Unit:
Gold Coast

Project Description:

– Mudgeeraba to Varsity Lakes Upgrade (M2VL)
– Varsity Lakes to Burleigh (VL2B) – Package A
– Burleigh to Palm Beach (P2PB) – Package B (SMA Infrastrucure)
– Palm Beach to Tugun (PB2T) – Package C

The Pacific Motorway (M1) Mudgeeraba to Tugun projects will upgrade 15km of the heavily congested M1 on the Gold Coast.

 

Our Role:

Construction Sciences is just completing M2VL and will begin Packages A & C providing CMT, Engineering & Environmental testing and support services until 2024.

At present we are suppling all CMT work, soils & concrete testing, All Environmental supervision & testing & also Geotechnical engineering.

Our resources are able to handle this volume of work through our Molendinar laboratory – it’s the largest CMT lab on the Gold Coast & we are utilising up to 30 local staff on these jobs.

*Stock image for illustrative purposes only